Princess 42

20 500 000 RUB (VAT not paid)

ShipyardPrincess Yachts
Year built2006
Hull / superstructure materialGRP
Length13,48 m
Width4,14 m
Draft1,09 m
Displacement170 tons
Engines2 x Volvo Penta D6 - 435 hp
Fuel reserve1362 l
Water supply455 l
Guests / cabins4 / 2
Crew / cabins2 / 1

Description

Equipment

  • Two refrigerators and a freezer on the flybridge.
  • Three-leaf sliding doors to the salon.
  • Hydraulic gangway aft.
  • The cockpit, swim platform and flybridge ladder are lined with teak.
  • Aft shower (cold / hot water).
  • Gas stove.
  • Raymarine navigation equipment (chartplotter and radar).
  • Autopilot Raymarine.
  • Diesel generator Onan 7kW.
  • Life jacket set.
  • Windshield anti-fogging system.
  • Bathrooms system A
  • Interior decoration - classic dark cherry.
  • Salon sofas - beige leather.
  • Indoor windows - Venetian blinds and textile curtains.
  • The sofas in the salon are transformed into an additional double bed.

For the period 17-18 years. the yacht has undergone a complete modernization

By body:

  • The bottom was cleaned by sandblasting along the water line, new soil and antifouling were applied.
  • The hull of the vessel is polished and covered with Soft99 H7 liquid glass.
  • Replacement with new original spare parts - shafts, screws, seals for propeller shafts and ballers, anodes, a thruster was installed, an automatic adjustment system for trance plates and new electric drives for trance plates were installed.
  • An additional 12V network was installed in all cabins and the saloon of the yacht.
  • New electromagnetic battery switches were installed. Installed inverter (24V - 220V) to power TV, DVD, satellite dish.
  • A complete audit of all systems and wiring was carried out.

Interior:

  • All carpets, all textiles (curtains, covers) have been replaced, the dashboard and ceilings in the cabin have been pulled over.
  • The sofas of the pocket part and the flybridge are tightened.
  • New tents - chassis, flybridge, glass, etc.
  • Protective nets are installed on the exhaust pipe to prevent animals from entering the exhaust system.
  • A stainless steel keel guard is installed in the bow.
  • Installed deck sink (high pressure).
  • A potable water pump is installed.
  • Installed stainless steel hoisting and dumping device at the stern of the tender boat.
  • A video monitoring system for the engine compartment, generator and stern was installed.
  • A new liferaft has been installed (in addition to the main one).

Maintenance was carried out according to the regulations. Preservation of all systems for winter storage

The yacht is in Irkutsk.

Send request