Princess 23m

930 000 € (VAT not paid)

ShipyardPrincess Yachts
Year built2008
Hull / superstructure materialSteel
Length22,83 m
Width5,71 m
Draft1,60 m
Displacement51,9 tons
Engines2 × CAT C32 1750 hp
Fuel reserve5 765 l
Water supply1 386 l
Guests / cabins8 / 4
Crew / cabins2 / 1

Description

The motor yacht SERENITY was built in 2008 at an English shipyard, model PRINCESS 23M, belongs to the M series, which means the category of luxury class.

  • Two main Caterpillar C32 engines, 1750 hp each. Operating time 620 hours.
  • Cruise fuel consumption 25 knots 190 liters per hour per engine.
  • Minimum fuel consumption on the move at 8 knots about 12 liters per hour per engine.
  • Diesel generator Onan 20 kW provides 220 V 50 Hz to all consumers on the yacht (chargers / batteries, operation of refrigerators and freezers, ice maker, air conditioning in heating and cooling modes, washing machine and dishwasher). Generator operating hours 2012.
  • The yacht is equipped with a comfortable galley, large owner's cabin, three guest cabins and a crew cabin. All cabins have their own sanitary unit, including toilet and shower. Toilets are equipped with vacuum toilets, which significantly reduce the consumption of fresh water.
  • All cabins and saloon are equipped with individual TV sets with DVD players.
  • The yacht is equipped with a crane for lifting out of the water RIB Williams 385.
  • Navigation equipment is standard to ensure safe sailing in virtually all weather conditions.
  • The rescue equipment has been checked and in good order.
  • The yacht was purchased in Cyprus, serviced by the local Princess service center.
  • Since 2014 is located in Montenegro.
  • All routine maintenance in accordance with the protocol for servicing the systems and mechanisms of the yacht was carried out in a timely manner by certified specialists, as there are corresponding records in the technical documentation.
  • The last service of the main engines and the diesel generator was carried out in April 2016, the service of the underwater part of the hull was carried out on May 14, 2016.
  • All systems and mechanisms of the yacht are in good working order. Diesel fuel stock is 25 percent.
  • Works on bench testing of turbines and cleaning of fuel tanks (a requirement of the Regulation on the amount of fuel consumed) are scheduled for October-November 2016.

Full refit was carried out in 2019

List of works:

  • Installed a new teak covering 10 mm thick
  • New mooring winches installed
  • Installed new transom plate drives
  • New connecting cables installed
  • Installed new cables for the crane
  • Completely polished
  • Installed new pillows on the flybridge
  • Installed a new cover for the captain's seats on the flybridge
  • Installed new underwater valves (7 pcs.)
  • Installed satellite dishes KNS, Internet antenna (GSM), apple TV
  • Placed a new carpet in the salon
  • Installed sun blinds (2 pcs.)
  • Installed underwater lights

Engine room:

  • Installed new coolers for both engines with modification
  • Installed water desalter
  • Repaired seawater pumps on both engines
  • Completed work on the generator
  • Carried out work on the steering device
  • Maintenance of fire extinguishers, engine fire extinguishing systems, steering compartment and liferaft fire extinguishing systems
  • Installed new batteries (9 pcs., 8 for the main engines and 1 for the generator)
  • Installed a new spare pump for the black water tank
  • The vacuum system of the toilets was sealed

Williams tender:

  • Installed a new engine and water cannon
  • Installed a new fuel tank
  • A new battery is installed

Motors and drive:

  • Installed hydraulic winch
  • Installed hydraulic bow thruster 25 hp.
  • Installed hydraulic stern thruster 25 hp.

Deck

  • Installed an entrance gate aft on the starboard and port side in addition to the standard gangway

Electrical system

  • Installed continental sockets 220V / 240V
  • Adjusted the third cockpit helm station (including engine controls, bow and stern thrusters)

Navigation

  • Installed optional Furuno GD1920C 10.4 ”display at main helm
  • Installed the European version of the VHF radio station
  • Installed TV 15 "and DVD player in the cabin on the port side
  • Installed TV 15 "and DVD player in the cabin on the starboard side

Interior refit

  • Replaced carpets in all cabins, saloon and stairs
  • New curtains in all cabins
  • New chairs in the dining area
  • Replaced headboards and bed sides in all cabins
  • New bedspreads in all cabins
  • New sofa in the master cabin
Send request